You do not need to wait for an EOL notice to start building an electronic component obsolescence plan. Define the BOM and the support period you actually need, then record each manufacturer's full ordering code, dated lifecycle evidence, supply signals, approved alternatives, owner, and next review. Keep official status separate from market observations. The plan should tell purchasing and engineering what to check before a problem becomes urgent—without treating a longer lead time as an end-of-life announcement.
Start with a Defined Product and BOM
Choose the product and BOM revision the plan covers. Include products still needed for repairs or service, even if regular production has ended. Ask planning or service teams to identify the intended support period and the assumptions behind it.
Check manufacturer names and complete ordering codes against the approved BOM. A shortened family name can hide differences that matter to the design. Keep proposed substitutes outside the approved list until the relevant engineering review is complete.
Separate the manufacturer, approved device, and seller. Several sellers can offer the same manufacturer's device without adding another manufacturing source. (Our guide to single sourcing and sole sourcing explains that distinction.)
This is continuing work. The public scope of IEC 62402:2019 places obsolescence management across an item's life cycle and includes developing a management plan. The register below is a practical starting point, not a claim of compliance with the full standard.
Build a Dated Component Risk Register
Use one record per full ordering code and link it to every relevant BOM revision. A spreadsheet is sufficient if the team can find the evidence and maintain the record. Keep unknown fields visible rather than filling them with assumptions.
Record Field | Information to Keep | Purpose |
|---|---|---|
Product and BOM | Product identifier and released BOM revision | Locate the affected design |
Device identity | Manufacturer and full ordering MPN | Avoid family-level assumptions |
Support need | Use, intended support end, and demand assumptions | Define the planning horizon |
Official evidence | Manufacturer status, source, document revision if available, checked date, and code coverage | Show what the manufacturer actually states |
Market observations | Specific signal, seller or other source, observation date, and unresolved conditions | Keep supply signals separate |
Alternative readiness | Candidate or approved code, applicable BOM, and approval reference | Expose remaining engineering work |
Responsibility | Named owner and required engineering, quality, or planning input | Assign the next action |
Review and escalation | Next review date, trigger, decision needed, and action deadline | Turn monitoring into follow-up |
Read lifecycle labels using the manufacturer's own definitions. For example, TI's lifecycle guidance distinguishes Active, NRND, Last Time Buy, and Obsolete. TI also explains that a generic product number represents a range of orderable parts. Check the coverage of the status or notice before applying it to your exact code.
A quoted lead time, an unavailable listing, or a seller's warning belongs in the market-observation field. Record what was offered, when, and under which conditions. These observations can justify an earlier review. They do not establish a manufacturer discontinuance decision.
Set Owners and Review Triggers
Assign work by decision. Purchasing can maintain manufacturer evidence and supplier follow-up. Engineering decides whether a candidate meets the design requirements. Quality contributes the applicable acceptance requirements. Planning or service confirms the support need. One record owner should keep these inputs connected.
The DLA-listed SD-22 guidebook addresses diminishing manufacturing sources and material shortages (DMSMS). It describes a multidisciplinary process to identify issues, assess impacts, and choose responses. Its defense-system context is distinct from a commercial purchasing requirement; it does not impose a universal review schedule on this register.
Set the next review date against the support need, evidence uncertainty, and the time required to investigate or qualify an alternative.
Define events that bring the review forward: changed official status, conflicting evidence, an unresolved notification, or repeated deterioration in relevant supply offers.
Specify who receives an escalation, what decision is needed, and when that decision must be made.
We recommend recording the reason for the interval. A stable, documented position may need a different cadence from an unresolved warning. A calendar reminder cannot replace an event trigger, and a trigger should not wait for the next scheduled review.
Check One Fictional Record
The following teaching example uses DEMO-CTRL-01, an invented internal reference. It is not a manufacturer part number, a real component offer, or a StockWake inventory record. In a working register, replace the placeholder identity with the actual manufacturer and full ordering code.
Record Field | Fictional Entry | Required Follow-Up |
|---|---|---|
Design and identity | Controller assembly A, BOM Rev C; DEMO-CTRL-01; actual manufacturer and MPN not entered | Complete identity before drawing a device-specific conclusion |
Support need | Repairs expected through 2031; demand assumptions remain open | Service owner confirms horizon and assumptions |
Official evidence | Scenario assumes an Active status checked on 26 November 2026; no discontinuance notice verified | Purchasing checks exact-code coverage and retains the source |
Market signal | Two successive offers from one seller show a longer estimated lead time | Check dates, terms, and manufacturer evidence; do not mark EOL |
Alternative and next review | No approved alternative recorded; purchasing owns follow-up; review on 3 December 2026 | Engineering reviews readiness; escalate unresolved identity or status before the fictional 10 December build decision |
These dates illustrate one scenario, not a standard review interval. The result is an investigation, not an automatic purchase or redesign. Keep the status unresolved where evidence is missing. After follow-up, retain the earlier observation and append the new evidence, conclusion, and next action.
Turn Changes into a Recorded Next Step
At each review, decide whether to keep monitoring, clarify conflicting evidence, start an alternative review, or move into a verified-notice response. Record the decision, its basis, responsible person, and due date.
When an official notice applies to the exact ordering code, use the stated dates and affected-product list. (Our PCN and EOL notice guide covers the next workflow.) A PCN may describe a change rather than discontinuance, so identify the notice type first.
If the investigation leads to an offered lot of discontinued material, use the separate obsolete component buying checklist for identity, condition, traceability, and acceptance. The planning record does not establish that a particular lot is available or acceptable.
FAQ
Can We Start Before Any Part Is Marked EOL?
Yes. Start with the products you need to build or support, then record component identity, official evidence, owners, and review triggers. Waiting for an EOL label leaves less time to resolve missing information or assess a candidate alternative.
Does NRND Mean Production Has Already Stopped?
Do not infer that from the abbreviation alone. Read the manufacturer's definition and check its scope. TI, for example, describes NRND products as available for existing designs while recommending alternatives for new designs. That is distinct from its Obsolete category.
How Often Should We Review the Register?
Set a documented interval for the product's needs and the uncertainty involved. Consider the support horizon and the time needed to respond. Bring the review forward when a defined trigger occurs. There is no single interval prescribed by this article.
Do We Need a Lifecycle Management Platform?
Not to begin this register. A maintained spreadsheet can hold the fields and evidence references. Choose tools according to the volume of records and the team's ability to maintain them; software does not decide whether a proposed replacement is approved.
Does an Approved Alternative Close the Risk?
It may address a specific design constraint, within the recorded approval scope. Check purchasing availability and transition readiness separately. Keep open actions visible until the responsible reviewers have resolved them.
Keep the Next Review Actionable
Start with a defined BOM, dated evidence, and an accountable owner. Set the next review and the conditions for an earlier one. A useful obsolescence plan leaves the next person able to see what is known, what remains open, and which action is due.