Guides · Sourcing

What to Check Before Accepting an NCNR Component Quote

Check which lines and quantities are NCNR, when the condition starts, and what written terms cover delivery changes, inspection and quality claims.

· StockWake team · Source: Original content by StockWake. Please credit StockWake when republishing.

Before accepting a quote for NCNR electronic components, confirm which parts and quantities it covers, when the commitment begins, and how changes or quality concerns will be handled. Keep the supplier's answers with the exact quotation revision you approve. The abbreviation alone leaves too much of the purchasing decision unresolved.

NCNR commonly means non-cancelable, non-returnable. ECIA's industry guideline describes it as a purchasing classification carried through the supply chain under written terms. The guideline also allows companies to determine practices that fit their needs. Read the conditions attached to your particular offer. ECIA NCNR guideline

Establish exactly what you are accepting

Find every place NCNR appears in the quotation, attachments and order conditions. Ask the supplier to resolve inconsistent wording before you issue an instruction to proceed.

A useful review record links each commercial condition to a specific quotation line.

Scroll sideways to see the whole table

Check

Information to obtain

Covered material

Manufacturer, complete orderable part number, quantity and quotation line

Scope of NCNR

Whether it covers the whole line, a special purchase, or specified delivery releases

Commitment point

The event at which the supplier says the condition takes effect

Changes

Conditions for cancellation, quantity reduction or rescheduling

Quality concerns

Applicable acceptance requirements, notification procedure and available remedies

Supporting record

Quotation revision, applicable terms and written clarification

Include the unit when confirming quantity. A commitment described as two reels still needs the actual number of pieces and the agreed packaging.

Match the commitment to the demand you can authorize

Before committing, check the requirement with the person responsible for the build or service demand. Confirm that the quantity and approved part remain current. If some demand is forecast, identify who is authorized to accept the resulting purchasing exposure.

Ask separately about the balance of a split delivery. Receiving the first shipment can leave further quantities to be delivered under the same order. The purchasing team needs to understand what it would be committing to for those later releases.

Clarify any payment, release or document-review steps that affect your decision. If the supplier changes the proposed quantity or delivery structure, review the affected conditions against that revised offer.

Agree how acceptance questions will be handled

Record the condition, identity and evidence you require before ordering. Ask how the supplier handles a wrong part, damaged material or a failure against agreed acceptance criteria, including the notification route and any required authorization before material moves.

A hypothetical quote review

A buyer requests 200 pieces of a fictional component. The supplier proposes 50 pieces in the first shipment and 150 later, with an NCNR note beside the line.

Before acceptance, the buyer asks the supplier to confirm whether the note covers all 200 pieces, when the commitment starts, and what quantity-reduction or rescheduling conditions apply to the remaining 150. The buyer also asks which acceptance requirements and claim procedure cover both shipments.

The supplier's written clarification is attached to the quotation revision sent for internal approval. If the answer leaves a material condition unresolved, the buyer takes that question to the person authorized to decide it.

Frequently asked questions

Are all obsolete components NCNR?

Check the particular offer. A component's lifecycle status alone does not establish your cancellation or return conditions. Use the obsolete-component buying guide for the separate checks on part identity, condition and remaining demand.

Does quotation validity mean stock is reserved?

Ask for the reservation or allocation basis separately. Record which quantity, period and conditions any confirmation covers. A quotation's validity period needs to be read alongside the supplier's availability conditions.

Can I accept only one line of a mixed quotation?

Identify the lines and quantities you intend to order and obtain the supplier's confirmation. Check whether minimum releases, pricing or other conditions change with that selection.

What if the quotation and purchase order disagree?

Send the conflicting wording to the supplier and your authorized commercial reviewer. Retain the resulting clarification with the order record so both sides can identify the agreed scope.

What if a problem is found after delivery?

Preserve the affected stock and evidence, and follow the notification and handling procedure agreed for the order. Refer unresolved questions about contractual remedies to the responsible commercial reviewer.